Spraying Foam Insulation with a Graco Fusion® CS Gun
Spray polyurethane foam insulation is applied to flat precast concrete wall panels. To learn more about the Graco Fusion CS, please visit www.graco.com/clearshot.
Instructions for applying ECO NO-OIL™ patented polymer coating to a steel concrete form. Once coated, the form will not require repetitive release agents when pouring concrete. The coating also protects the form from corrosion.
Tetrapods are vertebrate animals having four feet, legs or leglike appendages. Amphibians, reptiles, dinosaurs/birds, and mammals are all tetrapods, and even the limbless snakes and whales are tetrapods by descent. The earliest tetrapods radiated from the Sarcopterygii, or lobe-finned fish, into air-breathing amphibians. The first tetrapods are now thought to have evolved in shallow and swampy freshwater habitats, towards the end of the Devonian, a little more than 365 million years ago. This documentary walks through our early understanding and discoveries regarding the evolution of tetrapods. The list of known fossils possessing transitional features continues to grow. Osteolepis, Eusthenopteron, Sterropterygion, Panderichthys, Elpistostega, Tiktaalik, Elginerpeton, Densignathus, Ventastega, Metaxygnathus, Obruchevichthys, Hynerpeton, Acanthostega, Ichthyostega, Whatcheeria, Tulerpeton, Pederpes, Greerepton, Crassigyrinus, Pholidogaster, Pteroplax, Baphetes, Balnerpeton, Dendrepton, Silvanerpeton, Proteogryinus, Eoherpeton Every home should have the Animal Planet channel www.youtube.com
Haines and Kibblehouse, Inc. 10/10/2006 – 5/1/2007 Project Type: Commercial Client: AP / CRUZ Construction Owner: University of Penn Services Include: · Demolition Additional Project Features: · Imploded 7-story 146000 sq. ft. convention center building. · Interior demolition of concrete walls, ceilings, electronics, and machinery. · Employed 500 ton crane to remove 9×20′ precast concrete panels from exterior of building. · Project was constrained by nearby active construction site on east side, within 50 ft. of building and high voltage power lines within 35 ft. of building. Constant safety plans and meetings were a necessity for this project. · Explosives were handled by CDI — Controlled Demolition, Inc. · Once building was down we removed 3500 tons of scrap steel, 11000 tons of concrete and block, and 350 tons of other construction debris.
BioSTORM® is a pre-engineered stormwater treatment system designed to remove trash, sediment, oil and other pollutants from stormwater flows. The unique off-line design consists of a patented StormTEE™ self-cleaning deflector screen and a modular separation/coalescing unit, all housed in readily-available precast concrete tanks. The versatility of the system allows both treatment components to be used separately for different applications, or together to form a complete BioSTORM system. Various sizes are available depending on local site and environmental considerations.
KWP (Konstruct West Partners) provides 3d, innovative cost effective Facade Design + Consultancy Services including Construction and Project Management, LEED Certification for all types of exterior walls; custom curtain wall, glass wall, skylights, exterior stonework, masonry and precast concrete. KWP is your greatest source for Exterior Wall Consulting.
The Model 5590 Hydraulic Pipe cutter from Wheeler-Rex is the solution to cutting larger diameter Cast Iron, Tile and Concrete Pipe. Like the hand-operated snap cutters, hydraulic cutters are not rotated around pipe. Remotely operated hydraulic pumps provide the required pipe cutting power. A 2 inch to 3 inch minimum clearance is all that is needed to wrap cutter chain around pipe. The Model 5590 comes complete with a pump, hose and case. Designed to cut Service (Std.) WT soil pipe from 6 inch to 18 inch OD; XH soil pipe from 6 inch to 18 inch OD; Cast Iron Water Class 22 from 6 inch to 20 inch OD; Cast Iron Water Class 26 from 6 inch to 18 inch OD; and Tile and Concrete pipe from 6 inch to 36 inch OD.
An automatic distribution skip for concrete. Shown here mounted on the floor, overhead versions are also made to order. Supplying semi dry concrete for a Dry Cast machine making Cattle Slats.
soz its a bit late, ive been slacking i know :L Here’s the highly anticipated next release for the Nike CTR360 Maestri football boots. A boot that since its launch back on the 1st October, has been taking football pitches around the globe by storm! The list of players who have converted to the Nike CTR360 Maestri football boots certainly makes for impressive reading, and are a testament to the performance attributes of the CTR’s. Since their release we’ve seen such players as Cesc Fabregas, Andres Iniesta, Sergio Aguero, Javier Mascherano, Rafael van der Vaart, James Milner, Florent Malouda, Fernando Gago and Ashley Cole impressing in this brand new boot range. The new white/silver/neptune blue colourway is a great look, for this revolutionary football boot. The Nike CTR360’s have an innovative design to take ball control to the next level – by assisting a player to win the ball, keep control and distribute the ball. All performance attributes that have made these football boots particularly popular with playmaking midfielders. The upper of the Nike CTR360 Maestri football boots is made from a synthetic Kanga-Lite material, developed by Nike this material gives the same ball touch and feel of a natural K leather. But with the added benefit of being a more durable material that absorbs 20% less water than a natural leather, which also means the boot will remain lightweight in wet conditions. The stand-out design features of the Nike CTR360 Maestri football boots are the …
Varsity Village Linder Center is the capstone project for the athletic campus in the University of Cincinnati in Ohio. The Varsity Village building is LEED certified, and precast concrete contributed to the use of local materials, aggregates, and also recycled content.
Tetrapods are vertebrate animals having four feet, legs or leglike appendages. Amphibians, reptiles, dinosaurs/birds, and mammals are all tetrapods, and even the limbless snakes and whales are tetrapods by descent. The earliest tetrapods radiated from the Sarcopterygii, or lobe-finned fish, into air-breathing amphibians. The first tetrapods are now thought to have evolved in shallow and swampy freshwater habitats, towards the end of the Devonian, a little more than 365 million years ago. This documentary walks through our early understanding and discoveries regarding the evolution of tetrapods. The list of known fossils possessing transitional features continues to grow. Osteolepis, Eusthenopteron, Sterropterygion, Panderichthys, Elpistostega, Tiktaalik, Elginerpeton, Densignathus, Ventastega, Metaxygnathus, Obruchevichthys, Hynerpeton, Acanthostega, Ichthyostega, Whatcheeria, Tulerpeton, Pederpes, Greerepton, Crassigyrinus, Pholidogaster, Pteroplax, Baphetes, Balnerpeton, Dendrepton, Silvanerpeton, Proteogryinus, Eoherpeton Every home should have the Animal Planet channel www.youtube.com
BioSTORM Stormwater Treatment System (live action video)
The BioSTORM Stormwater Treatment System is a pre-engineered system designed to remove trash, sediment, oil and other pollutants from stormwater flows. The unique off-line design consists of a patented StormTEE self-cleaning deflector screen and a modular separation/coalescing unit, all housed in readily-available precast concrete tanks. The versatility of the system allows both treatment components to be used separately for different applications, or together to form a complete BioSTORM system. Various sizes are available depending on local site and environmental considerations.
Box Culvert Underpass Jogja by PT. LISA CONCRETE INDONESIA (Preliminary Design)
This box culvert were designed to buried under 4 railroad track, connecting between Apron and Terminals. This video shown an idea about how to install it. for more information, see our site : www.lisaconcrete.com
www.dominionprecast.com We manufacture precast concrete picnic and patio tables, concrete benches, memorial benches, concrete garbage cans and concrete planters. We are located in Kelowna, British Columbia, Canada Visit our website at www.dominionprecast.com
A 20-ton set of precast concrete steps is lifted by vacuum suction at the new promenade near Blackpool Central Pier. The Terex Demag AC200-1 mobile crane PL08ZBZ is operated by Jardine Crane Hire. 8th October 2008.
Aesthetic Bridge Rails and Guardrails – Federal Highway Administration – Video VH-1 – Roadside safety hardware can be compatible with scenic highways, national parks, and historic areas. Examples of steel-backed timber guardrails, precast reinforced concrete walls faced with native stone, glue-laminated wooden rails, and specially-designed precast concrete rails are shown in scenic locations and in crash-test footage. Brief mention is made of the additional cost of aesthetic design.
Edmonton architecture firm Manasc Isaac is hosting a series of “reimagine” summits in Alberta to look at replacing the drab precast concrete of our downtown cores with glassy new skins. The towers will be more energy efficient, more cost-effective, and much, much more attractive; and nothing, theoretically, has to be torn down. The clothing metaphor book-ending the video has a blessedly short though regrettable clip of a man in tighty whities.
Tekla 2010 BIM Awards: The New Pittsburgh Arena Parking Garag
Category 3 Winner Newcrete Products Category 3 Winner: The New Pittsburgh Arena Parking Garage, Newcrete Products This project is a parking structures which services the new Consol Energy Center; home of the Pittsburgh Penguins (NHL). The structure is 157945 sq. ft., a footprint of 335′x 127′, with 4 elevated levels and 1 on-grade level. The structure is entirely precast concrete with the exception of cast-in-place foundations and some steel framing in the stair towers. To qualify for Category 3 — Commercial / Institutional Concrete, the project model should be predominantly concrete but can include other materials. Commercial / Institutional examples include commercial offices, retail, government, sporting, religious, performing arts, educational, parking or transportation.
The precast panels were cast, at the construction site, at 900kg/ m3 (~60% less than the weight of traditional concrete). These lightweight panels were cast in the afternoon and then lifted the next morning (about 20 hours after pouring). For more information on the technology used to make lightweight concrete, please visit us at: www.phoenixsds.com or www.k-block.com
A Barton Case excavator is using a pick to break up precast steps on Blackpool promenade near North Pier. This row of steps was laid only a few months ago. Video taken 23rd September 2008.