PA Hall Implosion

PA Hall Implosion

Haines and Kibblehouse, Inc. 10/10/2006 – 5/1/2007 Project Type: Commercial Client: AP / CRUZ Construction Owner: University of Penn Services Include: · Demolition Additional Project Features: · Imploded 7-story 146000 sq. ft. convention center building. · Interior demolition of concrete walls, ceilings, electronics, and machinery. · Employed 500 ton crane to remove 9×20′ precast concrete panels from exterior of building. · Project was constrained by nearby active construction site on east side, within 50 ft. of building and high voltage power lines within 35 ft. of building. Constant safety plans and meetings were a necessity for this project. · Explosives were handled by CDI — Controlled Demolition, Inc. · Once building was down we removed 3500 tons of scrap steel, 11000 tons of concrete and block, and 350 tons of other construction debris.


Read the original post here : PA Hall Implosion

0 comments:

Post a Comment

Links

Blog Archive

About This Blog

  © Blogger template PingooIgloo by Ourblogtemplates.com 2009

Back to TOP