Wednesday, August 4, 2010

Lifting trailer and precast elements

Lifting trailer and precast elements

Solution for Precast Concrete Element Suppliers Movella lifting trailer system suits especially well for precast concrete element industry. Full load for the truck can be made on the trestles straight after mould. The load is transported with the trailer to the storage yard to wait for transportation. A truck with air cushion suspension can drive under the trestles and lift the load off the ground, after which the driver removes the legs of the trestles. The loading is complete! Check www.movella.fi.


Read the original post here : Lifting trailer and precast elements

0 comments:

Post a Comment

Links

Blog Archive

About This Blog

  © Blogger template PingooIgloo by Ourblogtemplates.com 2009

Back to TOP